You take the length of the branch and subtract the diameter from the length to leave room on each side for the branch, which makes sense ( ~25mm in this case). However, you then position the heat shrink 25mm from the branch point on one end. Would this not now make the other side ~12mm too far over?

I'll have a watch later on and see, but you want to end up placing the sheathing in the middle of the main branch. Its possible I said moving it 25mm, where I meant 12.5mm.

Okay, that's what I thought, but I just wanted to make sure I wasn't missing something. :)

Generalmente respondemos dentro de las 12 horas (a menudo antes)

¿Necesitar ayuda?

¿Necesitas ayuda para elegir un curso?

¿Tiene dificultades con el sitio web?

¿O necesita contactarnos por cualquier otro motivo?